Release notes

Swell period gets closer to the buoys, and the forecast reaches Brazil

Release “Mermaid-GSK”, 28 October 2026 · engine versions v118–v132

By David M. Mody · All model notes

In short: swell period is now typically within one second of what the buoys measure, open-ocean wave height is closer to the satellites, and the forecast covers northeast Brazil. There is nothing to switch on.

What you will notice

Why it changed

Waves of different lengths constantly hand energy to each other. This is what turns a choppy local sea into a clean long-period swell as it travels, and it decides when a swell arrives and how long its period is. The exact calculation is far too slow to run for every point of the ocean every few minutes.

The previous engine learned the answer from examples: a machine-learned model trained each day on exact solutions. It worked, but it needed retraining every day, and it was weakest exactly where its examples were thin, in unusual sea states.

The new engine, Mermaid-GSK, is a trimmed-down version of the exact physics: it keeps 64 of the exact calculation’s own patterns of energy exchange, weighted to stay as close as possible to the full calculation. The weights were fitted once. It needs no daily retraining, and it gives the same answer for the same sea state every day.

How we tested it

We re-ran four past periods in 2026, each with the best available winds (reanalysis), so any difference comes from the wave physics and not from a wrong wind forecast. A winter storm (14 February), late March, late April and early July were each scored against satellite altimeters and NOAA buoys.

One check is paused. The CFOSAT satellite, which measures wave period across the open ocean, has not published new data since 19 October, so we are not reporting period against satellites at the moment. Period is still checked against the buoys, as in the table below.

Test periodWave height error vs satellites (m)Correlation with buoysPeak period error (s)
14 Feb (storm)0.424 → 0.3930.81 → 0.881.30 → 0.86
27 Mar0.344 → 0.3230.88 → 0.901.40 → 0.80
22 Apr0.339 → 0.2820.90 → 0.911.31 → 0.92
6 Jul0.276 → 0.2410.72 → 0.861.16 → 0.64

Before = the previous engine, after = Mermaid-GSK. Wave height error is the typical size of the difference from satellite measurements over the whole 7-day run. Correlation (0 to 1) measures how well the forecast’s ups and downs follow the buoys’. Period error is the typical difference from the buoys’ peak period.

previous engine   Mermaid-GSK

0.00.10.20.30.414 Feb (storm)0.4240.39327 Mar0.3440.32322 Apr0.3390.2826 Jul0.2760.241
Wave height error against satellites, in metres. Shorter is better.

What is not better yet

Forecast skill, day by day ahead

The tests above use past periods. From this release on, every live forecast is also scored as the days it predicted arrive: the forecast made today for three days ahead is checked against what the buoys measure three days from now, next to the ECMWF and NOAA wave models.

previous engine   ECMWF WAM   NOAA WW3   Mermaid-GSK (from 30 Oct)

0.00.20.40.60.8todayday 1day 2day 3day 4day 5day 6ECMWF WAMprevious engine
Wave height error at the buoys (typical size, metres) by how many days ahead the forecast was made, scored on the buoy measurements of 25 and 26 October: two days, so read it as a starting line, not a verdict. NOAA WW3 is shown as points: on some days its forecast covers fewer days ahead, and those days are left out rather than scored, so its points rest on fewer measurements than the two lines.
Mermaid-GSK’s line starts on 30 October
Its first live forecast was issued on 28 October, so its first day-ahead scores arrive on 30 October. This chart fills in as they do.